Client Pain Points

  • Construct a risk linkage framework between transportation, display, and warehousing.

  • Introduce assessment criteria for artwork value and restoration feasibility.

  • Design a flexible underwriting structure with short-term and floating periods, and connect with the international expedited market.

  • High risk of fire and thermal runaway; technology is still evolving.

  • Lack of long-term loss statistics; market assessments are conservative.
  • Dispersed and inconsistent equipment concentration; high maintenance costs and monitoring difficulties.

Our Solution

  • Establish a full lifecycle insurance framework covering both the construction and operation phases.

  • Incorporate recommendations for thermal runaway detection and fire-resistant compartment specifications.

  • Connect with the international temporary storage market to strengthen the capacity to absorb energy storage risks.